Name of the Industrial Park/SEZ |
Mega Food Park Baheri |
Total Area of the Park (in Ha) |
99.62 |
Area Available for Allotment (in Ha) |
Shops |
0.09 |
Commercial land |
14.18 |
Industrial land |
54.00 |
|
Sector/Sectors in a Park (Mention All) |
Food Processing Units |
Nearest Point of Connectivity and Distance from the same |
Road |
Situated on “Bareilly -Nainital Road
Asian Highway 2 (AH2) (4 Km)
|
Railway |
Bareilly Railway Station (~ 67 Km)
Kichha Railway Station (~10 km) in Uttarakhand |
Metro |
NA |
Airport |
Bareilly Airport (~56 kms)
Pantnagar Airport (~28 kms)
Kanpur Airport (~340 kms)
|
Seaport |
Mundra seaport (~1395 kms)
Haldia Seaport (~1401 Kms)
|
|
Interesting Insights about the Park/SEZ for an investor |
- Equipped with internal road network, boundary wall, streetlight, sanitation
- Availability of utility services (electricity and dedicated substation and drinking water supply)
- Bareilly regions is rich in agriculture resources (like sugarcane and rice)
- Located in the border of UP and Uttarakhand - location suitable for investors from Uttarakhand
- Rich agriculture resources and food process industrial ecosystem of UP and Uttarakhand – beneficial for investors
- Nivesh Mitra, Single Window System for online land allotment and other services (24x7)
|
Available Facilities Near By |
- Police Station
- Fire Station
- Electrical Sub Station
- Post Office
- Bank & ATM
- Hospital
- Skill Development Centre
- Shopping complexes
- Petrol Pumps
- CNG Stations
- Public Toilet
- Streetlights
- Supplies Water
- Sewerage
|
Incentives Available |
Incentives under Industrial Investment and Employment Promotion Policy, 2017:
- Stamp duty exemption: 75% in Madhyanchal
- EPF Reimbursement: Facility to the extent of 50% of employer’s contribution to the units providing direct employment to 100 or more unskilled workers
- SGST Reimbursement: Net SGST reimbursement @90% for Small Industries for 5 years, @60% for Medium Industries for 5 years, @60% for Large Industries other than Mega Industries for 5 years, and @70% for Mega category Industries for 10 years.
- Capital Interest Subsidy: 5% per annum for 5 years, annual ceiling of INR 50 lakhs
- Infrastructure Interest Subsidy:5% per annum for 5 years, annual ceiling of INR 1 Crores
- Industrial Quality Development: 5% per annum for 5 years
- Electricity Duty: : 100% exemption to all new industrial units set up in the state for 10 years. Also, 100% exemption to all new industrial units producing electricity from captive power plants for self-use for 10 years
- Mandi Fee: 100% exemption to all new food processing units on purchase of raw material for 5 years.
Incentives under Food Processing Policy of UP:
- Capital interest subsidy: 25% of Expenditure on P&M up to ₹ 50 lakh; 10% additional for Mega Food Parks
- Interest Subsidy of Reefer Vehicles: Reimbursement of Interest 7% p.a. for 5 years up to ₹ 50 lakh
- Preparation of bankable projects: 50% assistance for DPR expense up to ₹ 5 lakh
- Marketing Development: 50% of cost for transport of samples abroad; 25% of export transportation cost; 20% of F.O.B. Price for export
- Patent / Design Registration: 75% of fees reimbursement up to ₹ 1.5 lakh
- Promotion for Standardization: 50% of Fee Reimbursement up to ₹ 50 Lakh for standardization of products
- Interest Subsidy: 100% of Interest – Micro and Small Units; 7% Interest up to ₹ 50 lakh for 5 years
- Food Processing Training Centres: 50% of Unit cost up to ₹ 1 lakh
- Infrastructure Grant-in-Aid: ₹75 lakh for infra facilities for Degree/ Diploma courses in Food Processing
|